The new pipeline is 485 km long and has a capacity to transport over 55 bln cbm/year of gas. The entire pipeline is 865 km long (Line 1 485 km; Line 2 380 km) divided into 14 lots: pipes have a diameter of 56 inches (1420 mm) and a thickness of 23mm and pass through the following German Länder: Mecklenburg-Western Pomerania, Brandenburg and Saxony. Bonatti plays a decisive role in the realization of the project with the execution of 6 lots.