The scope of the IWH Project is to step up the treatment capacity of production water destined for re-injection into the reservoir, and to extend gas compression capacity in order to boost the extraction of natural gas.
The greatest difficulty in the IWH Project is bringing new materials and equipment into the existing oil centre while the plant is running. In addition, project timing and logistics are also crucial, for the area is located in a remote part of the Sahara Desert with a very inhospitable climate, in conditions of extreme heat, wind and blowing sand.