Being located in an operational field, Bonatti will perform the activities in particularly challenging conditions such as brownfield and live plant, avoiding disturbances to the ongoing production.
Being located in an operational field, Bonatti will perform the activities in particularly challenging conditions such as brownfield and live plant, avoiding disturbances to the ongoing production.
The aim of the Project GCIP is the development and upgrading of the existing facility for future expected gas treatment and oil production at 2020 by installation of the new 2 x 37.5 MMscfd compressors, a dehydration train and their related systems.