Fast-track project for the installation of a GE MS5002D gas turbine in Karachaganak, in the Uralsk Region where environment is characterized by extreme temperatures that can go down to -30° C. The project definitely represents a great challenge due to technical and design difficulties and its remote location. The requested construction schedule is also particularly challenging.